Painting for our long-time general contractor clients requires that our team learns the sequence the builder prefers and bids the jobs accordingly. The interior photos in this blog post are from a recent project where the general contractor wanted a “wall-out” right after the drywall texture was completed and before any cabinets, doors or trim were installed. One advantage to this approach is that wall paint is much tougher than drywall texture so the paint protects the wall from minor scrapes and impacts during the finishing stages. This order works well for contrasting trim colors.
Other contractors may do the sequence differently for a variety of reasons. Perhaps they want to paint all of the trim and doors the same color and sheen as the wall paint. Maybe they want to eliminate an additional time slot for the painters before the finish carpenters begin, which can help a tight construction schedule. We can even put more than one crew (each with their own equipment) on one job to speed up the process.
In addition to the two approaches listed above, hybrids of these approaches can be employed such as primer between drywall prep and texture to help hide drywall joints.
Whatever the approach, we can accommodate your construction schedule and will bid the job according to your system. As a valuable member of your trade team, we can make suggestions and work with your other trade partners to help make up for some lost days on the construction schedule when needed.
Call Mike 541-497-3804 to talk schedule, bids and sequence for your upcoming new construction projects.
![](https://paintdrspainting.com/wp-content/uploads/2024/07/New-Construction-2-768x1024.jpg)
![](https://paintdrspainting.com/wp-content/uploads/2024/07/New-Construction-3-768x1024.jpg)
![](https://paintdrspainting.com/wp-content/uploads/2024/07/New-Construction-4-768x1024.jpg)